Engineering . Procurement . Construction


S/N PROJECT DATE CONTRACTOR CLIENT SUMMARY OF WORK DONE
1 Mobiltherm Heaters Upgrade- 2007/2008
Pretz Logo
Contact: Philip Ofuokwu
08038937786
Philip@pretzresources.com

ExxonMobil_Logo LEADCO executed this project as a subcontract for Pretz Resources Ltd. Work covered engineering, procurement & construction of instrumentation upgrade of manual ignition to remote auto ignition as well as installation of fire detection and alarm system on 2nos heaters in the crude oil treating plant at MPN’s QIT. Project was commissioned in Sep. 2008
2 Accelerated Temporary Gaslift System -
Aug. 2008 – Date
Wisbudd Logo
Contact: Wisdom Udo
08027236914
wisbuddtech@yahoo.com

ExxonMobil Logo LEADCO executed this project as a subcontract for WISBUDD Tech. Serv. Ltd. Work covered engineering, procurement & construction of tubing based gaslift system based on 2 philosophies.
1. Using a gas cap well to gaslift multiple under-performing wells.
2. using an HP gas from nearby compression station for platforms without gas producing wells. This has been implemented in 6 wellhead platform i.e. Ubit G, Mfem A & B, Unam B & C, Awawa ZBA
3 Accelerated Temporary Gaslift System -
Jun. 2009- Date
EATech Logo
Contact: Emmanuel Okon
08037542102
emmanuel.okon@engineering automation-ng.com

ExxonMobil Logo LEADCO executed this project as a subcontract Engineering Automation Technology Ltd. Work covered engineering, procurement & construction of tubing based gaslift system based on 2 philosophies.
1. Using a gas cap well to gaslift multiple under-performing wells.
2. using an HP gas from nearby compression station for platforms without gas producing wells. This has been implemented in 2 wellhead platform i.e. Ubit E & Ubit A
4 E&I Manpower Supply for EPC4A Projects – Onshore
Aug. 2008 – Nov. 2009
Ascot Logo
Contact: Rodney Hadlow
08055060410
rod.hadlow@ascotafrica.com

ExxonMobil Logo LEADCO provided over 15nos E&I technicians, supervisors, tools & equipment to carryout all electrical, instrumentation installations on 9 retrofit platform that was constructed onshore at Ascot Site 2, Choba, PH.
5 E&I Manpower Supply for EPC4A Projects – Offshore
Feb. 2009 – Sep. 2009
Ascot Logo
Contact: Rodney Hadlow
08055060410
rod.hadlow@ascotafrica.com

ExxonMobil Logo LEADCO provided 10nos E&I technicians, supervisors, tools & equipment to carryout all electrical, instrumentation offshore hook-ups of Ubit GY platform. High point of this project was installation & commissioning of the 30m high flare stack.
6 E&I Manpower Supply for Domgas Project
Sep. 2009 – Date
Ascot Logo
Contact: Rodney Hadlow
08055060410
rod.hadlow@ascotafrica.com

ExxonMobil Logo LEADCO provided 8nos E&I technicians, supervisors, tools & equipment to carryout all electrical, instrumentation installations for the Domgas project at Bonny River Terminal (BRT).
7 Inspection & Testing of Submarine Electrical Cable
Ascot Logo
Contact: Veera Raghavan
08077391963
veera.raghavan@ascotafrica.com

ExxonMobil Logo LEADCO provided E&I technicians, supervisor, tools & equipment to carryout all pre & post installation inspection & testing of a composite electrical, fibre-optic submarine cable (2km long). The cable was laid between Okan GGCP & Okan NWP platforms
8 Fibre Optic Cable Testing at BRT Domgas Project Site
Ascot Logo
Contact: Osaze Obaseki
08039758583
osaze.obaseki@ascotafrica.com

ExxonMobil Logo LEADCO provided telecoms technician & supervisor to carryout pre & post installation integrity tests on a fibre optic cable at the BRT Domgas project site
9 Calibration Services on Devices
Nov.- Dec. 2009
Ascot Logo
Contact: Rodney Hadlow
08055060410
rod.hadlow@ascotafrica.com

ExxonMobil Logo LEADCO provided instrument technicians, supervisor, tools & equipment to carryout onshore pre-shipment calibration and function testing of all devices on on 4nos retrofit EPC4A platforms. Total nos of devices tested is 133.


  • Contact Us

    +234 810 729 4056 +234 84 766984 info@albergy.com
  • Representatives to:

    Welker Inc. Leaders in the production and manufacture of valves, gas & liquid samplers, filters & driers, probes and instrumentation equipments. More…

    Lokring Technology LLC Manufacturers & producers of the most advanced fluid and gas transfer connectors on the market More…

  • Clients

© 2011 Albergy.com. Terms of Use Design by CSS Templates.    Developed by Prolyfique